Execution of:
– Temporary works.
– Site clearance and sand filling works.
– Test Piles and Load Test (General).
– Test pile and load tests. Turbine Area boring by hydraulic rotary rig.
– Ancillary works.
– Service piling works by hydraulic rotary rig.
– Foundation works.