4.88m x 4.88m base 45.73m height Glass Tower. 27'-0" certain area of pile foundation. 16 Number of pile having diameter 800mm with 26m long.
Construction of 5 storied buildings with basement. Plinth area 2091 sqm.
Construction of 2 Basement + 13 Storied DTCA Headquarter Building at Tejgaon, Dhaka.
Construction of Bangladesh Telecommunication Regulatory Commission Building (12 Storey with 3 Basement) at Sher-e-Bangla Nagar, Dhaka,
Construction of Bangabandhu Sheikh Mujibur Rahman Novotheatre, Rajshahi including Civil, Sanitary, Electrical and Ancillary Works.
Construction of Muslim Institute Complex, Chattogram (Construction of Library, Auditorium Building and Other Ancillary Works).
Construction of multi-storied office building complex of Dhaka Stock Exchange, at Nikunja, Dhaka.
Civil works of Sher-e-Bangla National Cricket stadium at Mirpur, Dhaka.
Construction of General Aviation Hangar, Hangar Apron & Apron at Hazrat Shahjalal International Airport, Kurmitola, Dhaka.
Extension of Apron towards north of the existing Export Cargo Apron at Hazrat Shahjalal International Airport, Dhaka.
Construction of 8-storied Building with 8-storied foundation including sanitary & water supply, electrification work, Ancillary works etc. at Foreign Ministry, Dhaka.
Construction of 5 Storied Hospital Building of Manikganj Medical College Hospital at Manikganj.
Construction of two 16 Storied apartment building with basements in Uttara, Dhaka.
Construction of 6-storied Building with 10 Storied Foundation having one Basement.
Establishment of Twenty Storied New Office Bhaban at Bangladesh Secretariat, Dhaka.
Construction of 10-storied Building at Sher-e-Bangla Nagar,Dhaka
Construction of 20-storied building with Helipad for National Crime Control & Monitoring Center, at Fulbaria, Dhaka.
Construction of office building with basement at Sher-e-Bangla Nagar, Dhaka.
Construction of 3-storied building and basement for International Mother Language Institute, Dhaka.
Construction of 3 storied conference center at Topkhana road, Dhaka.
Construction of 15-storied office building with 2 levels of basement at Ramna, Dhaka.
Construction of 10-storied academic building with 2 level basement of Ahsanullah University of Science & Technology at Tejgaon, Dhaka.
Modern flood light (tabular tower) of Sher-e-Bangla National Cricket Stadium, Mirpur, Dhaka.
Renovation and Restoration work of old court building, Chittagong.
Construction of 02 nos. Flyover and one Railway overpass of Dhaka-Khulna (N-8) Road Improvement Project at Bhanga, Faridpur.
Construction of 3x At-Grade Intersection Work at Purbachal Link Road,Purbachal, Naryanganj.
Execution of the work of 4 Laning of Comilla (Tomson Bridge)- Noakhali (Begumganj) Regional Highway
Widening, Strengthening, Surface work and Construction of 33nd km to 72nd km of Zinzira-Keraniganj-Nababganj-Dohar-Sreenagar Road under Munshiganj Road Division.
Widening, Strengthening and Surfacing Work of Gafforgaon-Bormi-Mawna Road (R-314) under Gazipur Road Division.
Excecution of the Works for Widening Strengthening and Surfacing Works of Mawna-Sreepur-Ghosinga-Kapasia-Aral-Shomania-Hatirdia-Monohordi (R-313) Road.
Dense Bituminous Surfacing (DBS) Wearing for Dhaka-Chittagong National Highway (N1) & Dhaka-Sylhet National Highway (N2) under Narayangonj Road Division.
Embankment Slope protection works 3.30 Km (Approx,) including supplying & placing of CC Blocks of different sizes, Geotextile, Brickchips and Sand as filter, Cement Concrete (CC) works etc.
Execution of work of helipad, road, watch tower, car parking, guest house, labor shed, access road, jetty road, test piling and load test.
Execution of Site arrangement, site development and all temporary site works.
Execution of Site arrangement, site development and all temporary site works.
Execution of Site clearance, sand filling, ancillary, pilling and foundation works.
Up-gradation of Sirajganj 150MW peaking power plant to 225MW combined cycle Power Plant.
Execution of Topological survey, Geo technical investigation works, River Water Sampling & Testing, Temporary Installations and Piling works for Power Plant.
Execution of Geo technical investigation works, Piling works of different structures and different Civil foundation and Structural works.
Detailed Design and Construction of a new Factory, Energy Center, Office Building, Canteen, Gate House, Ancillary Buildings, Security Buildings, Leaf Shed Refurbishment, Utilities, Infrastructure, All associated external works etc.
Construction of Main Building, storage and road of Dekko Garments at Sreepur, Gazipur
Effluent treatment plant of Agami Washing Ltd.at pallibidyut chandra, Kaliakoir, Gazipur.
Construction of 2-storied building of Colormaster Ltd. Factory at Valuka, Mymensingh.
Construction of 3-storied factory building at Mouna, Sreepur, Dhaka.
Bonded warehouse and yarn dyeing unit of Epyllion Fabrics Ltd.
Construction of automobile shop of Bangladesh University of Engineering & Technology.
Vertical extension works of knitting and garments industrial building at Gazipur.
Construction of factory building and other ancillary works at Sadarganj, Gazipur.
Vertical extension works of knitting and garments industrial building at Gazipur.
Dredging of Tentulia River from Bokshi Launchghat to Baburhat Launchghat area from the Erosion of Tentulia River including Dredging Work and Flood Protection in Kukri-Mukri Island at Charfession Upazila under Bhola District
Removing of Submerged Char, Dredging work of the Jamuna river in “Protection of Right Bank of the Jamuna River at Brahmangram-Hatpachil and its adjacent areas under Shajadpur Upazila and Strengthening of Betil Spur-1 and Enayetpur Spur-2 Project” in Sirajganj.
Capital Dredging of Karnafuli River Including Maintenance Dredging from Km 8.400 to Km 10.00 in Between km 5.00 to km 10.00 total 1.600 km in Upazila-Rangunia Dist Chattogram under Rangamati O&M Division BWDB Rangamati.
This will close in 0 seconds